Etabs Mass Summary By Story Better 2021 Instant
This will generate a clear grid displaying your stories, their respective masses in orthogonal directions, and the mass moment of inertia ( MMIcap M cap M cap I 🔍 Why the Mass Summary by Story is So Critical
They updated the mass source to include PARTITION and converted cladding to Additional Mass . The new Mass Summary showed a 28% increase in seismic weight.
| Column | Description | Engineering Significance | |--------|-------------|--------------------------| | | Floor level | Check mass jumps between stories | | UTotal (or UX, UY, UZ) | Translational mass (same in X & Y for symmetric buildings) | Lateral seismic mass: dead + appropriate live load + partition + equipment | | RTotal (or RX, RY, RZ) | Rotational mass moment of inertia about vertical axis | Affects torsional response (accidental eccentricity) | | Self Mass | Mass from element self-weight | Based on assigned materials | | Additional Mass | User-defined mass (shell uniform load, point masses) | Often missed – check carefully | etabs mass summary by story better
In the realm of structural engineering, gravity is the ultimate critic, and inertia is its partner in crime. When analyzing a building in CSI ETABS, the is often viewed as a mere formality—a single table to check before running a response spectrum analysis. However, treating this summary as a simple output is a missed opportunity. To be a better engineer, one must treat the Mass Summary not as a result, but as a diagnostic tool for model integrity, load path rationality, and dynamic behavior.
in the Mass Source definition simplifies the system into a multiple-degree-of-freedom (MDOF) model, which is often more practical for large buildings but less "rational" than distributed mass at every node. 3. Optimizing the Mass Source for Better Reports This will generate a clear grid displaying your
You start at the bottom. This is your . You recruit the heaviest, strongest Sumo wrestlers you can find. They are massive.
| Symptom | Likely Cause | Fix | | :--- | :--- | :--- | | Mass at roof is too high | Penthouses, water tanks not modeled as separate stories | Assign point mass or model as a dummy story | | Mass is negative or zero | Invalid constraint or bi-axial hinge | Check Display > Show Undeformed > Joints for errors | | Cumulative mass changes after analysis | Mass source relies on load-dependent deflection (e.g., nonlinear) | Use linear static for mass source | | Mass differs between ETABS and Excel takeoff | Line loads, area loads not converted to mass | Convert all Uniform Loads to Mass via Assign > Area Loads > To Mass | When analyzing a building in CSI ETABS, the
Roof mass is 39% higher than typical floor due to penthouse and water tank weight being mis-assigned.